DESCRIPTION
The theater building was built in the 50s of the twentieth century. Overhaul has not been in the building.
Completed works:
- replacement of the heating system;
- repair of systems of ventilation and electricity;
- finishing work on the premises and the auditorium of the theater with the replacement window blocks in the windows with aluminum frames;
- cladding marble tile walls and floors in the lobby of the theater;
- installation in new auditorium seats;
- installation of a unique lighting design of the auditorium.
CHARACTERISTICS
- Location: Atyrau
- Project: overhaul and reconstruction
- Customer: Atyrau Mayer of Kazakhstan
- General Contractor: LLP “Bonita Engineering”
- Project implementation term: from May to September 1999