DESCRIPTION
The construction of a swimming pool on a “full construction” in the north-eastern sector of Uralsk (between 4 th and 6 th district).
A two-storey building. There is a swimming pool, changing rooms, sauna, sanitary facilities, and attendants’ room on the ground floor. There are spectator stands, restaurants and administrative offices on the first floor.
Project parameters:
- Building area – 2,348 sq.m.
- Total area – 3,583 sq.m.
- The number of tracks in the pool – 6
- Track length – 25 m
- The height of the tower diving – 3 m
- Capacity of the stands – 296 seats
CHARACTERISTICS
- Location: Uralsk
- Project: new construction
- Client: Karachaganak Petroleum Operating B.V
- General Contractor: LLP “Bonita Engineering”
- Project implementation term: from June 2002 to September 2003